Public service information for Salt Lake City
Bath Fitter’s official Salt Lake City location page identifies its Utah operation at 9076 S 300 W, Sandy, Utah, describes it as serving Salt Lake City, and lists bathtub remodeling, shower installation, tub-to-shower conversion, and related bathroom-remodel services.
Read the official service source →
Salt Lake City planning context
Salt Lake City Building Services states that work involving the alteration or improvement of a building’s electrical, plumbing, or mechanical systems requires obtaining the prescribed permits, and directs applicants to submit building-permit applications through the City’s Citizen Access Portal.
Read the local permit or planning source →
Housing and neighborhood context
Salt Lake City’s official Housing SLC plan reports that 41% of the city’s housing units have three or more bedrooms and that 10,135 new units received certificates of occupancy from January 2017 through November 2022, compared with 3,807 from January 2010 through December 2016.
Salt Lake City identifies East Central as a neighborhood bounded by 700 East and 1400 East and by South Temple and 900 South, with housing that includes late-19th- to mid-20th-century single-family residences and 1950s–1960s apartment buildings.
Read the housing-context source →
Read the neighborhood-context source →
State-derived project planning range
For a tub-to-shower conversion in Salt Lake City, the approved UT state multiplier produces a transparent planning range of $1,483 to $7,909. This is not a Bath Fitter price, a city-specific contractor bid, or a substitute for a written local scope.
The range uses the approved per-project master rate card and the published UT state multiplier. Removal, disposal, hidden conditions, permits, selections, and access requirements should be identified separately in a written proposal.
Compare the same scope in writing
- Ask every provider to identify the product system, materials, installation approach, and warranty terms.
- Confirm removal, hauling, disposal, preparation, and repair responsibilities.
- Ask how permit requirements and existing-condition findings are documented.
- Compare schedule, cleanup, change-order, and final walk-through terms—not only a headline number.